JDZ Block 1

| Block 1 |
|
Working Interest
|
4.41% |
Production Start-up
|
– |
Production Peak
|
– |
| Operator |
Chevron |
| Work Programme |
Exploration |
JDZ Block 1
Afren holds a 4.41% net working interest in the JDZ Block-1 exploration licence through a 49% equity interest in Dangote Energy Equity Resources Limited. The Obo-1 well was drilled early in 2006, and discovered both oil and gas with a total of 150 ft of net pay.
Operations Update
Technical studies are ongoing on Block 1 prior to further drilling. Exploration drilling on the adjacent Blocks 2, 3 and 4 is expected in 2009 and further drilling on Block 1 will, most likely, commence after the neighbouring drilling activity has been completed. We are currently moving into the next license phase on the Block.
Fast Facts
- Chevron operated Obo-1 discovery (150 ft net pay) in March 2006
- 6 prospects identified
- Billion barrel reserves potential