Iris Marin Permit
Operations update
A well on the Charlie prospect was spudded on 5 July 2008 and was drilled to a depth of 1,640 metres. The reservoir was encountered as planned, but was found to be water bearing, and the well is therefore being plugged and abandoned.
A number of additional leads/prospects have been identified, which are currently being evaluated.