Operations
| Block 1 | |
|---|---|
| Working Interest | 4.41% |
| Production Start-up | - |
| Production Peak (bopd) | - |
| Operator | Chevron |
| Work Programme | Exploration |
JDZ Block 1
Afren holds a 4.41% net working interest in the JDZ Block-1 exploration licence through a 49% equity interest in Dangote Energy Equity Resources Limited. The Obo-1 well was drilled early in 2006, and discovered both oil and gas with a total of 150ft of net pay.
Operations Update
Technical studies are ongoing on Block 1 prior to further drilling.
Exploration drilling on the adjacent Blocks 2, 3 and 4 is expected in 2009 and further drilling on Block 1 will, most likely, commence after the neighbouring drilling activity has been completed.